Customization: | Available |
---|---|
CAS No.: | 63148-60-7 |
Formula: | Ho-Si(CH3)2o[Si(CH3)2o]Nsi(CH3)2-Oh |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Other product | Other product | ||
Property | Unit | Result | Result |
appearance | clear,white | clear | |
Uncured specific gravity | pas | 1.08,1.56 | 1.08 |
Viscosity at 120°C (248°F) | wt% | >60 | >60 |
Nonvolatile content | minutes | ≥97.5 | ≥98.5 |
Open time2 | days | 20 | 15 |
Cure time, 3 mm bead³ | <2 | <2 | |
Hardness - durometer Shore A | psi | 55-65 | 55-65 |
Ultimate tensile strength | >600 | >600 | |
Ultimate elongation | % | >1200 | >1200 |
Adhesion-in-peel strength | pli | >30 | >30 |
Service temperature range | ºC(ºF) | -50 to 150 (-58 to 302) | -50 to 150 (-58 to 302) |
Shear adhesion failure temperature | ºC(ºF) | > 300 (> 572) |
> 300 (> 572) |
1.Prohibit contact with water, steam, alcohol solvents (such as alcohol).
2.Construction temperature of 5-32 ºC is preferred.
3.We should wear gloves, masks, etc. for protection when using to prevent allergic reactions.
4.in order to prevent the liquid into the eyes caused by allergies, you can wear an eye mask when dispensing.
5.After construction, it is advisable to wash hands before drinking or eating to avoid ingesting glue components.
6.The product should be stored in a ventilated, dry, cool place, prevent direct sunlight, storage temperature 8-28 ºC.
1.Before construction, the glass-roots level will be cleaned up, no dust, oil and other substances that affect the bonding strength.
2.This product can be used for spot gluing, the spot gluing area should be not less than 10% of the pasted area; you can also use the following 4mm tooth-shaped trowel to pull the teeth of the full scraping and paving, after the completion of the adhesive layer thickness of up to 3mm is good.
3.Adjustment should be completed within ten minutes after dispensing.
4.The product room temperature curing, surface drying time: 45Min, full curing time: 24h.
5.Application temperature range: -40ºC-+100ºC..
1.Prohibit contact with water, steam, alcohol solvents (such as alcohol).
2.Construction temperature of 5-32 ºC is preferred.
3.We should wear gloves, masks, etc. for protection when using to prevent allergic reactions.
4.in order to prevent the liquid into the eyes caused by allergies, you can wear an eye mask when dispensing.
5.After construction, it is advisable to wash hands before drinking or eating to avoid ingesting glue components.
6.The product should be stored in a ventilated, dry, cool place, prevent direct sunlight, storage temperature 8-28 ºC.